Stability & Handling
Stability
A comprehensive check can be performed for the stability during handling and hauling of the girder.
Stability parameters are per Mast 1989 and 1993.
Days:
Initial Eccentricity: Initial eccentricity of center of gravity of beam.
Camber: Camber measured in inch.
Support Start/End: Support locations can be specified for lifting and handling as well as a separate set for hauling. Both the start and end support locations can be independently specified from the start and end of the beam, respectively.
Impact: Separate impact factors can be specified for form suction, handling, and shipping. Impact is treated as a percent of the self-weight of the beam and is checked in both the positive (downward) and negative directions.
Wind Load, kip/ft: Wind load along the length of the beam.
Lifting from Bed
Rigid Lift Extension Above Girder:
Lateral Tolerance Lifter From Centerline:
Inclined Lifting Cables check box:
Seated On Dunnage
Bearing Width:
Roll Center To Bottom of Girder:
Roll Center To Bearing Seat:
Bearing Tolerance Center Line Girder Center Line Support:
Bearing Rotational Stiffness, kip-ft/rad:
Leveling Seating Tolerance, in/in
Seated on Transport
Roll Axis to Center Line Tire Group:
Roll Center to Bottom of Girder:
Roll Center to Roadway:
Bunking Tolerance Center Line Girder to Center Line Support:
Hauling Rig Stiffness, kip-ft/rad:
Superelevation, in/in:
Turn Radius Adverse Cross Slope:
Turn Velocity, in/s: