Stage

Loads

Load Factors5

Limit States3

Cross-Section

Time (days)

Material Properties and Losses1

Boundary Conditions2

Comments/Details

Production

 

 

 

 

 

 

 

 

Transfer/Release

P/S + SW

1.0

Transfer

Non-Comp.

1-2

Initial

User Defined

Component still present in casting bed, includes calculation of Att4

Stripping

P/S + SW

User Defined

S&H

Non-Comp.

1-2

Initial

Stripping

Pulling the member out of the casting bed (Deflection Stage 1 - Beam)

Handling (in yard)

P/S + SW

User Defined

S&H

Non-Comp.

1-2

Initial

Handling

Moving the member from the casting bed to the storage yard (Beam)

Transportation

P/S + SW

User Defined

S&H

Non-Comp.

User Defined

Initial

Transportation

Placing the member on the truck and driving to the construction site (Wall)

Construction

 

 

 

 

 

 

 

 

Erection

P/S + SW

User Defined

S&H

 

Non-Comp.

User Defined

Final

Erection

Lifting the member from the truck and setting it in place

Post-Erection

P/S + SW

By Spec.

Final

 

Non-Comp.

User Defined

Final

In-place

Member set in in-place position, may have construction loads

 NC Loads

P/S + SW + NC (excl. topping)

By Spec.

Final

Non-Comp.

User Defined

Final

In-place

Non-composite permanent loads added, excluding topping weight (Deflection Stage 2 - Beam), may have construction loads

 NC Topping

P/S + SW + All NC

By Spec.

Final

Non-Comp.

User Defined

Final

In-place

All non-composite permanent loads added (topping is placed) (Deflection Stage 3 - Beam), may have construction loads

In-Place

 

 

 

 

 

 

 

 

 Comp Loads

P/S + SW + NC + C DL

By Spec.

Final

Composite

100,000

Final

In-place

Composite permanent loads added (Deflection Stage 4 - Beam)

 Final

P/S + SW + NC + C DL + LL

By Spec.

Final

Composite

100,000

Final

In-place

Final conditions, all permanent and transient loads placed (Deflection Stage 5 – Beam)

...