Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Per WsDOT BDM section 8.3.4B, the ground acceleration (PGA) can be reduced according to the depth of fill. The ground motion attenuation is shown in table 1 (below). For a fill of 16', the ratio of ground motion to motion at burried structure is 1.0.

...

Calculate the Free-Field Relative Displacement

...